Case Study

The 1248
This 144-unit condominium in downtown Montreal is 100% EV Ready, thanks to the installation of RVE products for each parking space. Completed in 2024, the project was skillfully carried out by the Gaston Ouellette et Fils team.
Technical Specifications
Type of construction
existing building (retrofit)
Type of occupancy
condo
Building size
101 to 200 units
Number of floors
6 to 10
Number of parking spaces
26 to 100
Location of electricity meters
Location of parking spaces
indoor, covered
Type of parking spaces
assigned
Products Used
Challenge
Powering an electric vehicle charging infrastructure for all indoor parking spaces in a multi-unit building where the electric meters are located in the garage basement (accessible).
Solution
Using a homogenous solution was possible to power charging infrastructure between all indoor parking spaces of this condo building and the EV chargers that were requested to be installed. Indeed, all meters are accessible, allowing the use of DCCs everywhere.
- DCC-9-BOX, DCC-9-BOX3 and DCC-9-BOX6 to provide charging infrastructure without installing chargers right away
- DCC-9 for units with an electrical panel of 125A and less in need of a charging station right away
A total of 72 DCCs were installed on the second floor of the underground parking garage. Cable trays have been installed on the second floor of the parking for future connection of charging stations, and pull boxes have been installed for cable routing between the two parking levels. 10 charging stations have been installed to date.
“We’ve installed DCC-BOX columns to connect the charging stations. We’ve had a request for 10 charging stations to start with, but at least everything will be ready to install more charging stations in the future; all we’ll have to do is add the PCB electronic component inside the DCC-BOX.”
Mathieu Bernard
Electrician, Gaston Ouellette et Fils