Charge Controller

DCC+

Electric Vehicle Energy Management System 30A/40A/50A/60A
The DCC+ is an energy management system specially designed to allow the connection of a charging station, or other types of load, to an electrical panel without affecting the charging calculation.

The little +? It connects to the HUB by RVE for multi-level energy management, protecting the entire electrical infrastructure of the building.

ULC-ORD-3141 Certified

Product information

Can protect all components of a building’s electrical infrastructure when connected to the HUB, such as the main service, transformers, or any other critical component
Avoids the need to upgrade existing electrical infrastructure (electrical panel, main service).
Versatile product that can be used in Individual or Connected mode
Ideal for installation in multi-unit residential buildings (condominiums, rental buildings)
Automated billing for electricity consumed by electric vehicles (kWh)
Configurable DIP switches: increased flexibility for connecting a load (charging station, spa, subpanel, etc.) to a panel with limited capacity
No additional load on the electrical panel of the dwelling
Eligible for peak demand management (PDM) programs and integration of power outage restoration capabilities
Several models available: DCC-9+, DCC-11+
CSA and ULC-ORD-3141 Certified
Made in Canada
Monitors in real time the energy consumption of the condo’s electrical panel and the energy consumed, in amps, by the charging station;
Detects when total energy consumption exceeds 80% of the main circuit breaker’s capacity and temporarily cuts power to the charging station;
Automatically powers back up the charging station when the total consumption of the electrical panel is below 80% of its capacity for more than 15 minutes;
Monitors in real time the energy consumption of the condo’s electrical panel and the energy consumed, in amps, by the charging station;
The HUB monitors the main service, transformers or any other critical component;
Detects when total energy consumption exceeds 80% of the main circuit breaker’s capacity and temporarily cuts power to the charging station;
The HUB detects when the total energy consumption of the electrical infrastructure exceeds the predetermined maximum thres- hold, and modulates charging for all residents on an equitable basis;
Automatically powers back up the charging station when the total consumption of the electrical panel is below 80% of its capacity for more than 15 minutes;
Automatically powers back up the charging station when the HUB detects that total consumption is below the maximum threshold of the electrical infrastructure;
Optimizes charging sessions to ensure optimal and equitable energy distribution among all residents.
You want multi-level energy management to protect the electrical infrastructure of the entire building.
At least one HUB by RVE is installed in the building or will be installed at a later date;

See actual DCC+ installations in these multifamily buildings.

Standard warranty: 12 month warranty from date of delivery
Warranty limited to equipment and components supplied by Recharge Véhicule Électrique Inc. (see installation manual for details)

Installation Examples

Software

Access the Connect Portal

The RVE Connect portal is an online dashboard that lets you see and manage your RVE EV charging system in real time. It brings all connected equipment (HUB, DCC+, SMP+) into one place, making it easy to monitor charging activity, track energy use, and manage billing efficiently.

A free, comprehensive guide designed to support your next EV charging project — delivered straight to your inbox.

Need some help?

Where to buy

Contact us directly for assistance in choosing the right product. Our advisors are here to help you from start to finish with your home charging projects!