Case Study

The Saint-Augustin

This newly-constructed 12-unit rental building is now equipped with a charging infrastructure for each tenant, thanks to the installation of RVE products. The installation was carried out by the Accès Électrique inc. team.

Technical Specifications

Type of construction

new build

Type of occupation

rental

Building size

25 units and less

Number of floors

moins de 5

Number of parking spaces

25 and less

Location of electricity meters

accessible

Location of parking spaces

outdoors; possible wet conditions (rain/snow)

Type of parking spaces

assigned

Products Used

Challenge

Powering an electric vehicle charging infrastructure for all units in a multi-unit rental building. When the units in a building are leased rather than purchased, it becomes all the more important to be able to manage the energy consumed by each tenant’s electric vehicle charging.

Solution

  • 12 DCC-9-BOX in columns (2 x DCC-9-BOX6) connected to electricity meters

Benefits:

  • Avoids the need for adding dedicated panel and meters.
  • Simplifies billing: electricity is billed directly to the tenant.
  • No management required for owners.
  • Access to attractive residential rates.
  • Generates owners additional income from electrified spaces, with no management effort.