Sanctuaire – phase 1

RVE technologies were installed in Phase 1 of this 7-phase condo complex in order to get parking spaces EV Ready. The installation was carried out by the team at Lilco Électrique inc.

Technical Specifications

Type of construction

existing building (retrofit)

Type of occupation

condo

Building size

101 to 200 units

Number of floors

11 to 20

Number of parking spaces

101 to 200

Location of electricity meters

accessible from the parking spaces

Location of parking spaces

indoor, covered

Type of parking spaces

assigned

Products used

Challenge

Powering an electric vehicle charging infrastructure in a multi-unit building where the electric meters are located in the garage basement (accessible).

Solution

Using a homogenous solution was possible to power charging infrastructure between the units of this condo building and the EV chargers that were requested to be installed. Indeed, all meters are accessible, allowing the use of DCCs everywhere:

  • DCC-9 for units with an electrical panel of 125A and less in need of a charger now
DCC-9
DCC-9