RVE technologies were installed in this 23-unit condo complex in order to get parking spaces 100% EV Ready. The installation was carried out by the team at Lilco Électrique inc.

TECHNICAL SPECIFICATIONS

Type of construction

existing building (retrofit)

Type of occupancy

condo

Building size

25 units or less

Number of floors

20 to 30

Number of parking spaces

25 or less

Location of electricity meters

accessible from the parking spaces

Location of parking spaces

indoor, covered

Type of parking spaces

assigned

Products used

Challenge

Powering an electric vehicle charging infrastructure in a multi-unit building where the electric meters are located in the garage basement (accessible).

Solution

To power a charging infrastructure for the 23 units of this condominium, a homogeneous solution was possible. Indeed, all meters are accessible, allowing the use of DCCs everywhere.

  • DCC-9-BOX to provide charging infrastructure without installing chargers right away
  • DCC-9 for units with an electrical panel of 125A and less wanting a charger now
DCC-9
DCC-9