RVE technologies were installed in this 23-unit condo complex in order to get parking spaces 100% EV Ready. The installation was carried out by the team at Lilco Électrique inc.
TECHNICAL SPECIFICATIONS
Type of construction
existing building (retrofit)
Type of occupancy
condo
Building size
25 units or less
Number of floors
20 to 30
Number of parking spaces
25 or less
Location of electricity meters
accessible from the parking spaces
Location of parking spaces
indoor, covered
Type of parking spaces
assigned
Products used
Challenge
Powering an electric vehicle charging infrastructure in a multi-unit building where the electric meters are located in the garage basement (accessible).
Solution
To power a charging infrastructure for the 23 units of this condominium, a homogeneous solution was possible. Indeed, all meters are accessible, allowing the use of DCCs everywhere.
- DCC-9-BOX to provide charging infrastructure without installing chargers right away
- DCC-9 for units with an electrical panel of 125A and less wanting a charger now