Case Study

Le Solano (phase 7)
This 7th phase of a Montreal condo complex followed in the footsteps of its neighboring phases to install electric vehicle charging stations, using RVE technology as well. The project benefited from the expertise of engineering firm Dupras-Ledoux and the Lilco Électrique inc. team for the installation, which was completed in 2022.
Technical Specifications
Type of construction
existing building (retrofit)
Type of occupancy
condo
Building size
101 to 200 units
Number of floors
11 to 20
Number of parking spaces
101 to 200
Location of electricity meters
accessible and inaccessible from the parking spaces
Location of parking spaces
indoor, covered
Type of parking spaces
assigned
Products used
Challenge
Powering an electric vehicle charging infrastructure in a multi-unit building where some of the electric meters are located on the roof (inaccessible) and others are located in the garage basement (accessible).
Solution
To power a charging infrastructure for some of the 146 units of this condominium, a dual solution was required. Indeed, since some of the meters were accessible while others were not, different technologies were installed.
For the units with an accessible meter, the DCC product line was used:
- DCC-9 for units with an electrical panel of 125A and less wanting a charger now
For the units with an inaccessible meter, the SMP product line was used:
- SMP-18