Parking spaces are now EV Ready thanks to the RVE technologies installed in this 6-unit condo building in Montreal. The installation was carried out by the team at Lilco Électrique inc.

Technical Specifications

Type of construction

existing building (retrofit)

Type of occupancy

condo

Building size

25 units and moins

Number of floors

5 and less

Number of parking spaces

25 and less

Location of electricity meters

accessible from the parking spaces

Location of parking spaces

indoor, covered, and outdoor with possible wet conditions

Type of parking spaces

assigned

Products used

Challenge

Powering an electric vehicle charging infrastructure in a multi-unit building where the electric meters are located in the garage basement (accessible).

Solution

Using a homogenous solution was possible to power charging infrastructure between the units of this condo building and the EV chargers that were requested to be installed. Indeed, all meters are accessible, allowing the use of DCCs everywhere.

  • DCC-9-BOX to provide charging infrastructure without installing chargers right away
  • DCC-9 for units with an electrical panel of 125A and less in need of a charger now
DCC-9
DCC-9-BOX