Le Clairevue

Over the years, requests for having EV chargers installed multiplied, leading to the implementation of a 100% EV-Ready strategy in order to…

De l’Épée

Parking spaces are now EV Ready thanks to the RVE technologies installed in this 6-unit condo building in Montreal.

Atwater

RVE technologies were installed in this 40-unit condo complex in order to get parking spaces EV Ready. The installation was carried out…

Quartier 54

RVE technologies were installed in this 348-unit condo complex in Montreal in order to get parking spaces EV Ready. The installation was…

Sanctuaire (phase 4)

As in Phase 1 of this condo complex, RVE technologies were installed in Phase 4 in order to get parking spaces EV…

Outremont

RVE technologies were installed in this 23-unit condo complex in order to get parking spaces 100% EV Ready. The installation was carried…

Logan Lane

RVE technologies were installed in the parking lots of this 61-unit condo building in Vancouver. The team at Relight Solutions completed the…

Victoria (phase 4)

Following the installation of EV charging in Phase 2 of this condo complex in Saint-Lambert (QC), common infrastructure was also installed in…

Victoria (phase 2)

To prepare this condo building in Saint-Lambert (QC) for EV charging, a common infrastructure was installed to ensure a smooth implementation of…

Gallery (phase 2)

RVE technologies were installed in Phase 2 of this 3-phase condo complex in order to get parking spaces EV Ready. The installation…

Gallery (phase 1)

RVE technologies were installed in Phase 1 of this 3-phase condo complex in order to get parking spaces EV Ready. The installation…

Sanctuaire (Phase 1)

RVE technologies were installed in Phase 1 of this 7-phase condo complex in order to get parking spaces EV Ready. The installation…

Metcalfe

RVE technologies were installed in this 33-unit condo complex in order to get parking spaces EV Ready. The installation was carried out…

De la Commune (phase 3)

This 8-phase condominium located in Montreal prepared Phase 3 of its complex for electric vehicle charging by installing RVE technologies. The installation…

Terra Nova

To enable home charging for all units of this Terrebonne rental building, the developer, Groupe GDI, planned to install the necessary infrastructure…

Sommets sur le Fleuve 4

This condo complex in l’Île-des-Soeurs is 100% ready for EV charging thanks to the RVE technologies installed. The project benefited from the…