Skip to main content

Case Studies

Filter

De l’Épée

Parking spaces are now EV Ready thanks to the RVE technologies installed in this 6-unit condo building in Montreal.

Atwater

RVE technologies were installed in this 40-unit condo complex in order to get parking spaces EV Ready. The installation was carried out…

Outremont

RVE technologies were installed in this 23-unit condo complex in order to get parking spaces 100% EV Ready. The installation was carried…

Gallery (phase 2)

RVE technologies were installed in Phase 2 of this 3-phase condo complex in order to get parking spaces EV Ready. The installation…

Gallery (phase 1)

RVE technologies were installed in Phase 1 of this 3-phase condo complex in order to get parking spaces EV Ready. The installation…

De la Commune (phase 3)

This 8-phase condominium located in Montreal prepared Phase 3 of its complex for electric vehicle charging by installing RVE technologies. The installation…

Terra Nova

To enable home charging for all units of this Terrebonne rental building, the developer, Groupe GDI, planned to install the necessary infrastructure…

Sommets sur le Fleuve 4

This condo complex in l’Île-des-Soeurs is 100% ready for EV charging thanks to the RVE technologies installed. The project benefited from the…