Skip to main content

Case Studies

Filter

Le Clairevue

Over the years, requests for having EV chargers installed multiplied, leading to the implementation of a 100% EV-Ready strategy in order to…

De l’Épée

Parking spaces are now EV Ready thanks to the RVE technologies installed in this 6-unit condo building in Montreal.

Atwater

RVE technologies were installed in this 40-unit condo complex in order to get parking spaces EV Ready. The installation was carried out…

Quartier 54

RVE technologies were installed in this 348-unit condo complex in Montreal in order to get parking spaces EV Ready. The installation was…

Sanctuaire (phase 4)

As in Phase 1 of this condo complex, RVE technologies were installed in Phase 4 in order to get parking spaces EV…

Outremont

RVE technologies were installed in this 23-unit condo complex in order to get parking spaces 100% EV Ready. The installation was carried…

Logan Lane

RVE technologies were installed in the parking lots of this 61-unit condo building in Vancouver. The team at Relight Solutions completed the…

Victoria (phase 4)

Following the installation of EV charging in Phase 2 of this condo complex in Saint-Lambert (QC), common infrastructure was also installed in…

Victoria (phase 2)

To prepare this condo building in Saint-Lambert (QC) for EV charging, a common infrastructure was installed to ensure a smooth implementation of…

Gallery (phase 2)

RVE technologies were installed in Phase 2 of this 3-phase condo complex in order to get parking spaces EV Ready. The installation…

Gallery (phase 1)

RVE technologies were installed in Phase 1 of this 3-phase condo complex in order to get parking spaces EV Ready. The installation…

Sanctuaire (Phase 1)

RVE technologies were installed in Phase 1 of this 7-phase condo complex in order to get parking spaces EV Ready. The installation…

Metcalfe

RVE technologies were installed in this 33-unit condo complex in order to get parking spaces EV Ready. The installation was carried out…

De la Commune (phase 3)

This 8-phase condominium located in Montreal prepared Phase 3 of its complex for electric vehicle charging by installing RVE technologies. The installation…

Sommets sur le Fleuve 4

This condo complex in l’Île-des-Soeurs is 100% ready for EV charging thanks to the RVE technologies installed. The project benefited from the…