Skip to main content

Case Studies

Filter

Logan Lane

RVE technologies were installed in the parking lots of this 61-unit condo building in Vancouver. The team at Relight Solutions completed the…

Victoria (phase 4)

Following the installation of EV charging in Phase 2 of this condo complex in Saint-Lambert (QC), common infrastructure was also installed in…

De la Commune (phase 3)

This 8-phase condominium located in Montreal prepared Phase 3 of its complex for electric vehicle charging by installing RVE technologies. The installation…