Le Clairevue

Le Clairevue

Over the years, requests for having EV chargers installed multiplied, leading to the implementation of a 100% EV-Ready strategy in order to…
Atwater

Atwater

RVE technologies were installed in this 40-unit condo complex in order to get parking spaces EV Ready. The installation was carried out…
Victoria (phase 2)

Victoria (phase 2)

To prepare this condo building in Saint-Lambert (QC) for EV charging, a common infrastructure was installed to ensure a smooth implementation of…
Metcalfe

Metcalfe

RVE technologies were installed in this 33-unit condo complex in order to get parking spaces EV Ready. The installation was carried out…
The Kent

The Kent

This 42-unit condominium in Montreal prepared its parking spaces for electric vehicle charging by installing RVE technology. The installation was carried out…