Skip to main content

Case Studies

Filter

Installation extérieure de DCC-9-3R / Outdoor installation of DCC-9-3R

Outdoor installation

DCC-9-3R were installed outdoors in this new condo building of 7 units.

De l’Épée

Parking spaces are now EV Ready thanks to the RVE technologies installed in this 6-unit condo building in Montreal.

Outremont

RVE technologies were installed in this 23-unit condo complex in order to get parking spaces 100% EV Ready. The installation was carried…