Skip to main content

Case Studies

Filter

Quintessence

With the aim of giving all its residents access to electric vehicle charging at home, the Quintessence condo board opted for RVE…

Le Solano (phase 7)

This 7th phase of a Montreal condo complex followed in the footsteps of its neighboring phases to install electric vehicle charging stations,…

Sanctuaire (phase 4)

As in Phase 1 of this condo complex, RVE technologies were installed in Phase 4 in order to get parking spaces EV…

Gallery (phase 2)

RVE technologies were installed in Phase 2 of this 3-phase condo complex in order to get parking spaces EV Ready. The installation…

Gallery (phase 1)

RVE technologies were installed in Phase 1 of this 3-phase condo complex in order to get parking spaces EV Ready. The installation…

Sanctuaire (Phase 1)

RVE technologies were installed in Phase 1 of this 7-phase condo complex in order to get parking spaces EV Ready. The installation…